• 12600 Welch Road | Dallas, TX 75244 | www.dallasisd.org/nathanadams

     

    Nathan Adams Elementary is undergoing a $6.72 million renovation that includes:

    Exterior Renovations:

    • Replace all exterior windows throughout
    • Provide new front entry canopy
    • Replace ADA entry ramp
    • Replace concrete paving as required
    • Replace asphalt play area with concrete
    • Add concrete paving to dumpster drive
    • Provide enclosure for existing recycling dumpster
    • Replace existing marquee sign with new LED sign
    • Paint all previously painted exterior surfaces
    • Replace exterior and site lighting with LED fixtures

    Interior Renovations:

    • Provide new secured front entry vestibule
    • Provide new reception and principal’s office
    • Replace carpet and vinyl composition tiles in areas specified
    • Paint all previously painted interior surfaces, including walls and ceiling
    • Replace interior lighting throughout with LED fixtures
    • Replace fire alarm system
    • Replace various mechanical equipment
    • Replace various plumbing and mechanical piping

Project Timeline

  • 1 Planning
    Completed
    Checkmark-Completed
    2 Design
    Completed
    Checkmark-Completed
    3

    Construction
    Completed

     Checkmark-Completed
    4 Ribbon-Cutting
    Completed  
    Checkmark-Completed
    5 Opening
    February 2022
    Checkmark-Completed
    6 Project Close-Out
    Completed
    Checkmark-Completed

     

Related News

Other Resources